6 problems to pay attention to before and after the construction of foamed concrete
If you are looking for high-quality products, please feel free to contact us and send an inquiry, email: brad@ihpa.net
Under the spread of the new crown epidemic, after Americans experienced life and death, they set off the largest "resignation wave" in history, and the number of resignations broke the highest record since statistics began in 2000. Since April this year, more than 4 million people in the United States have voluntarily resigned each month. In August, the number of resignations exceeded 4.27 million, and in November, it rose to 4.4 million. The operation of society is linked. The large number of departures in the United States has led to a large shortage of labor; and the shortage of a large number of labor has directly led to the supply chain crisis in the United States; the supply chain crisis has directly affected prices and prices in the United States. The economy has a direct effect on people's lives.
The economic downturn will affect the market demand for foamed concrete.
1. Determine the material
The compatibility of cement foaming agents and the foaming machine is the first consideration. Because there is a problem with compatibility between cement foaming agent and cement foaming machine. To understand the compatibility of the cement foaming agent, it is also necessary to determine the reasonable dilution ratio of the foaming agent. If it is the first time using the cement foaming agent, it is recommended to refer to the dilution ratio recommended by the manufacturer and then combine it with your machine test to find the most suitable dilution ratio.
2. Cleaning up the construction site
The first is to clean up the debris and install the water and electricity. Sprinkle cleaning to moisten the surface of the cast-in-place operation; pay attention to the watering must be even and do not have water accumulation.
3. Test whether the foam generator is regular in advance
The test method is to dilute the foaming agent according to a specific ratio, then make foam, and arrange the foam outside the machine to see whether the foam moisture content and the viscosity of the foam are standard.
Whether the bubble is about 1mm, if the moisture content is high, the cells may need to be replaced with steel balls.
4. During the construction of foamed concrete, it should be noted that the slurry of foamed concrete cannot stay, and it should be leveled immediately after pouring to make it stop.
To prevent the foam from breaking and collapsing after re-construction after static stop.
5. Attention should be paid to the influence of air temperature during the construction of foamed concrete. When the air temperature is below 10 degrees, a foaming agent with high stability and suitable for winter application should be selected.
When the air temperature is lower than 5 degrees, it is recommended to use early-strength composite Portland cement in addition to an excellent foaming agent. If conditions permit, a simple plastic greenhouse can be built.
6. Construction in summer requires main moisturizing and maintenance. There are two ways to choose, one is to cover straw curtains, reed mats, sacks, sawdust, wet soil, and wet sand, and the other is to cover with plastic sheets
TRUNNANO is a concrete additives supplier with over 12 years experience in nano-building energy conservation and nanotechnology development. We accept payment via Credit Card, T/T, West Union and Paypal. Trunnano will ship the goods to customers overseas through FedEx, DHL, by air, or by sea.
If you are looking for high quality foaming agent, please feel free to contact us and send an inquiry.
sales@cabr-concrete.com
New Delhi: India's Oil Ministry recently conveyed its intention to five national oil companies including Indian Oil Corp and Bharat Petroleum Resources LTD to assess the possibility of buying shares in Russian oil projects sold by European and American oil majors.
Bp announced it would give up its 19.75% stake in Rosneft, the Russian oil company. ExxonMobil said on March 1 that it would exit about $4 billion in assets and terminate all of its Russian operations, including the Sakhalin-1 project in Russia's far East.
India's oil ministry has asked the overseas investment arm of India's Oil and Gas Corporation to consider buying ExxonMobil's 30 percent stake in the Sakhalin 1 project in Russia's far East. ExxonMobil is the operator of the project and Indian companies already have a 20 percent stake in the project.
Because of the ever-changing international situation, the supply and prices of international bulk foamed concrete are still very uncertain.
Inquiry us